Commissioning & parts programs

Service packages that publish SLA clocks for pivots and fertigation skids

Valley Irrigation services pair field commissioning with spare staging so farm managers know when gearboxes, sprinklers and dosing pumps will arrive relative to irrigation season peaks.

Pivot commissioning pack

Alignment checks, nozzle chart verification and controller handoff on new center pivot installs, including end-gun duty confirmation against design flow.

  • Tower motor amp draw log
  • Uniformity sample on two radii
  • Operator checklist in English/Spanish

Fertigation calibration pack

Inline EC/pH probe calibration, injection pump stroke checks and chemigation valve documentation for EPA and local water authority reviews.

  • Dose rate worksheet (gph)
  • Alarm threshold sheet
  • Backflow inspection stamp

Seasonal parts staging

Pre-position critical drip tape fittings, VFD pump seals and sprinkler packages before the first irrigation week for each dealer territory.

  • Named SKU kits per system
  • 48–120 hour response classes
  • Dealer yard staging photo log

How commissioning sequences protect seasonal water windows

Most irrigation failures during peak weeks are not mysterious — they are missing amp logs, unverified nozzle charts or fertigation pumps that never received a stroke calibration. Valley Irrigation service packs force those artifacts into the handoff packet before water starts moving.

On center pivot projects, crews walk tower motors under dry and wet torque, capture end-gun overlap photographs and confirm GPS alignment against the span geometry sheet. On drip and micro systems, filtration differential pressure is logged after the first flush so silt load surprises do not appear mid-season. When fertigation is present, dual EC/pH probes are calibrated against a lab standard and alarm thresholds are written into the irrigation controller configuration export.

Limitation: SLA clocks assume the dealer ticket includes serial numbers and a photo of the failed assembly. Tickets that only say “pivot down” are returned for clarification rather than falsely started, because incorrect staging wastes the grower’s irrigation day.

Parts response SLA table

Response clocks start when a dealer ticket lists serial number, tower position and failed component class. Times below are working hours in covered territories.

Component class Standard window Peak-season window Evidence attached
Pivot gearbox / tower motor 72 hours 48 hours Serial photo + amp history
Sprinkler / pressure regulator 48 hours 24 hours Nozzle chart revision
Fertigation dosing pump 96 hours 72 hours Stroke calibration sheet
Irrigation controller module 120 hours 72 hours Firmware / config export

Request a commissioning or parts SLA review

Share irrigated acres, system serials and the irrigation week you must protect. We return a written staging plan dealers can execute.